The questions customers ask most: chemical-free operation, cycles of concentration, and how to size the equipment.
No dosing under normal operation — but what about commissioning and water quality swings? Four conditions to check before you consider it.
Cycles of concentration are capped by scaling tendency, not pumping capacity. What GB/T 50050-2017 requires, and why it matters.
Going one size up buys the wrong machine. Give us tower flow and four make-up water numbers for a selection report.
The two routes carry different cost structures. Fix four premises, include blowdown and fouling losses, and the comparison becomes meaningful.
Risk comes from anodic chlorine and cathodic scaling. What is controllable, which materials matter, and what to monitor for acceptance.
Side-stream flow is not a guessed percentage: size from scaling rate, solids load and equipment hydraulics, then take the largest.
Suppression is not sterilisation. Confirm the boundary by system type, temperature and Legionella rules, and keep a verifiable biocide measure.
Evaporation is not saveable; blowdown is. Add water, sewer and chemical charges to get the real benefit.
Equipment is a third of the job. Take-off points, pump and piping, power, drainage, access and transition plan must all be settled first.
Approach temperature and vacuum move first, not water temperature. Three numbers to log weekly, and when to act.
Electrolyser, side-stream pump and auxiliaries. An estimation structure and the five site inputs needed for a real figure.
Filtration removes particles; electrochemical treatment removes dissolved ions. Different jobs, different installation order.